For sale solar project 6 (5.99) MWp in Prahova county Romania FJ009
Type Two solar photovoltaic parks for green energyPark n° 1 : "FV1" Park n° 2 : "FV2"
Planned commissioning, completion 2012
Location Romania, Prahova County
Total Land Size approx. 14 haInstalled capacity approx. 5.99 MWp
Installed capacity at kW installed approx. 5991 KWp
Solar Modulus - free choice: single panel power: 230 Wp - Silicon
Productivity 7000 MWh / year
Calculated annual yield 7000 MWh / year
Compensation for power supply 6 Green Certificates + Energy Price
Calculated investment costs pro MW ca./approx. in € 2.000.000 € / MWLeases
Price of the land: 2.500 €/year/ha
Project Price: 200.000 €/MWp
Nr. FJ009
More info: frjacobs@telenet.be
For sale solar project 2.6 MWp in Dolj county Romania FJ017
Size/Radiation
Size (system capacity): 3.26 MW
Output: 2.605 MW
Annual Irradiation (PVGIS): 1440 KWh/M2
Authorization & Connection Status
Project Type: Ground based Solar Plant
PV System Type: Poly Cristal (can be changed)
Stage: Partially Permitted
Completion Date: N/A
Connection Date: Within 2-3 Month
Permissions still to be obtained: BP
Taxes still to be paid: € 49.500
Components
Modules: (To be specified by investor)
Inverters: (To be specified by investor)
Note:[Ex.: type and brand of inverters can be changed at additional costs (re-permitting taxes)]
Land
Plot Size: 5,6 hectare
Status of use: Intravilan (with BP)
User rights: Long Term Rent (option for Purchase)
Yearly costs: 400 EURO/ha
Distance to Grid Connection: 200 Mtrs.
Tariff
Total tariff (Q1-2012): +/- €390/MWh
Type of tariff: FIT+GC
GC term: Green Certificates 15 Yrs.
FIT Payments: According to ANRE average (€52/MWh)
Green Certificates: 6
Green Certificate Price: €57.35 (Q1-2012)
Deal Structure
Buyer obtains 100% of the shares in the SPV]
Revenues (forecast)
Annual Production: 3.428.000 KWh
Annual Revenues: € 1.336.920
Annual Costs: € 156.000
Investment (Project Acquisition)
Net Investment per MWp: € [207.293]***
Net investment Total: € [540.000]
more info mail me frjacobs@telenet.be
Nr. FJ017
For sale solar project 5.7 MWp in Teleorman county Romania FJ015
Following permits and authorizations have been issued:
• Urbanism Certificate
• Environmental Terms
• Grid Connection Terms
• All necessary authorizations and positive opinions from authorities and local councils,municipal and regional, are valid in place.
• Building Permit
• Power Purchasing Agreement is concerned, the work for obtaining this has commenced.
Tracking systems with double axis
The 5,7 MWp project will be constructed with double axis tracking systems.
The PV Park will utilize 285 double axis tracking systems with 20 kWp installed capacity each, placed is such way to avoid shadowing and maximize energy yield.
Tooling
Electrical Equipment including medium and low voltage equipment will be delivered by the ABB concern whereas the cabling will be imported from the EU having all necessary certifications and other regulatory norms. All the equipment will be TUV certified, assuring the proper quality needed for obtaining the desired energy output.
Output
Using the PVGIS interactive on-line tool to access the solar radiation and photovoltaic potential of the area, the park output is estimated at 6,950,000 kw with a fixed system, and 9,590,000 with a double axis tracking systems.
Nr. FJ015
Price on demand: frjacobs@telenet.be
For sale solar project romania Gorj province 20MW FJ010
A solar project of 20 MW in the province of Gorj near Tirgu Jiu on a surface of 52 hectares of land.
The grid feed in is 23.063 Mwh and the specific annual yield is 1.153 kwh/kWp.
contact frjacobs@telenet.be
project nr . FJ010
For Sale solar project Romania 3 MW project in Arges County FJ011
Location: Arges County
The plot is located at the Southern entrance passage through the Carpathian Mountains, Romania, 800 m from the asphalt to the European road E574 to Brasov (70 km) or Pitesti (60 km).
Land Size: 9.2 hectares (1.8 hectares of land registered within the built-up area, the difference is registered as meadow)
Land Type: naturally and partially forested, road access with 0.2% slop.
Photovoltaic Installation: 3 MW
Ownership: Company
Distance to the Grid: 800 m from the 20 kV National network
Remarks:
Urbanism Certificate - in process;
PUZ/Plan for Urban Zoning - in process;
No Geo-technical Hazard;
Meteorological Institute info: 2075 hours of Insolation and 4380 hours day light per year.
Nr. FJ011
more info frjacobs@telenet.be
For sale solar project in Romania 56MWp in Satu Mare county FJ012
Solar project in Satu Mare county on 143 hectares with 56 MWp and 59.125 MWh.
Nr. FJ012
More info : frjacobs@telenet.be
Solar projects in romania in Dolj County 80MW - several projects all between 4.8 and 10 MW FJ013
General Area Information
Average GHR radiation in sites is in the range of 1400 KWh/m² and 1480 KWh/m² , among the best areas in Romania for solar PV .
The area is suitable for solar PV developments (the first projects to obtain the connection permit in the corresponding substations).
Projects will be delivered at fully permitted stage.
For the PPA, Installation license and Grid Connection Agreement to be obtained, the final shareholder structure must be officially presented, and also the investment breakdown must be known.
Capacity
Large pipeline of 10 projects totaling near 80 MWp on more than 170 Hectares ;
Concentrating in 4 different 20/110KV substations owned by CEZ Oltenia;
Installed capacity ranging between 4,8 – 10 MWp;
Connection in MV with an average distance to the substation of 250 meters /MWp;
Land for the projects is owned by the SPVs.
Nr. FJ013