vrijdag 28 september 2012
For Sale solar project Romania 3 MW project in Arges County FJ011
Location: Arges County
The plot is located at the Southern entrance passage through the Carpathian Mountains, Romania, 800 m from the asphalt to the European road E574 to Brasov (70 km) or Pitesti (60 km).
Land Size: 9.2 hectares (1.8 hectares of land registered within the built-up area, the difference is registered as meadow)
Land Type: naturally and partially forested, road access with 0.2% slop.
Photovoltaic Installation: 3 MW
Ownership: Company
Distance to the Grid: 800 m from the 20 kV National network
Remarks:
Urbanism Certificate - in process;
PUZ/Plan for Urban Zoning - in process;
No Geo-technical Hazard;
Meteorological Institute info: 2075 hours of Insolation and 4380 hours day light per year.
Nr. FJ011
more info frjacobs@telenet.be
Abonneren op:
Reacties posten (Atom)
Geen opmerkingen:
Een reactie posten