1.      Opportunities and projects renewable energy Romania
2.      Market intelligence: news on wind energy solar energy in Romania and other renewable energy projects in Romania
3.      Incubation activities of the chamber for your energy projects
4.      Projects management activities for your energy projects

The full report is in anexa 25 pages of market news.

1.    Opportunities and projects renewable energy Romania
1.1 Turn key projects:
We have 3 turn key solar plants for sale in Romania in Constanta county.
1 PV plant of 4.5 MW*
1 PV plant of 3.0 MW*
1 PV plant of 4.8 MW*
*installed DC
We are looking for funds or other investors to buy them ( Alt - Energy funds, Energy Funds, Pension Funds, etc...private investors with own equity). They are compliant with the EU and Romanian regulations in place. The solar plants are delivered by an asset deal (sharedeal) in Q4 of 2013 depending on the project execution (ongoing). The are located beside the Romanian Caost line at  he Black Sea. We ask that only serious investors react. We only deal directly with the investors.
1.2  Ready to build projects:
Arges County: 2.7 MW
The project is made for building a photovoltaic park, producing energy and connecting with the National Energy System.
Location: Arges County
Land: easement contract
Type: ground base
Surface: 5.2 ha
Installed power: 2.7 Mw
Output power: 2500 kW
Stage: fully permitted, ready to construct

Arges county: 0.89 MW
The project is made for building a photovoltaic park, producing energy and connecting with the National Energy System.
Location: Arges County
Land: easement contract
Type: ground base
Surface: 14 ha
Installed power: 0.89 Mw
Output power: 800 kW
Stage: fully permitted, ready to construct

Dolj county: 3MW
The project is made for building a photovoltaic park, producing energy and connecting with the National Energy System.
Location: Dolj County
Land: superficie contract
Type: ground base
Surface: 6.5 ha
Installed power: 3 Mw
Output power: 2900 kW
Stage: fully permitted, ready to construct

Gorj county: 2.7 MW
The project is made for building a photovoltaic park, producing energy and connecting with the National Energy System.
Location: Gorj County
Land: superficies contract
Type: ground base
Surface: 47.8 ha
Installed power: 2.7 Mw
Output power: 2500 kW
Stage: fully permitted, ready to construct

Covasna county: 2.9 MW
The project is made for building a photovoltaic park, producing energy and connecting with the National Energy System.
Location: Covasna County
Land: superficies agreement
Type: ground base
Surface: 7.6 ha
Installed power: 2.9 Mw
Output power: 3200 kW
Stage: fully permitted, ready to construct