Posts tonen met het label agricultural land romania. Alle posts tonen
Posts tonen met het label agricultural land romania. Alle posts tonen

donderdag 24 juli 2014

list with agriculture land In romania lijst met landbouwgrond in Roemenie

Undefined
 
LAND PROJECTS PRESENTATION
 
    
nr
name of project
county
details
900 - A26



900 Timis province 120 hectares orchard
with fruit trees project A26
Timis






Lot size: 120Ha
Type of surface: orchard with fruit trees
Soil quality: chernozem, podzolic
Soil type: 3 - 4 class
901 - A25



901 Timis province 180 Hectares agricultural soil and orchard
Timis




Lot size: 180Ha
Type of surface: agricultural soil and orchard
Soil quality: chernozem
Soil type: 2 class

902 - A22



902  Arad province 731 hectares farm land
project A22
Arad



Lot size: 731Ha
Type of surface: all farmland
Soil quality: brown soil
Soil type: category II
903 - A24


903 Timis province 820 hectares
agricultural soil project A24
Timis



Lot size: 820 ha
Type of surface: agriculture soil
Soil quality:sandy loam
Soil type: 2 class
904 - A5



904 Timis province 447 hectares farm land
project A5
Timis



Lot size: 447ha
Type of surface: agriculture soil
Soil quality: brown soil
Soil type: 1 and 2
905 - A12



905 Dolj province 1800 hectares farm land
project A12

Dolj



Lot size: 1800ha can be expended till min. 5000ha
Type of surface: arable
Soil quality: class I-II-III
Soil type: chernozem, luvsols
906 - A11





906 Dolj province 780 hectares farm land
project A11


Dolj





Lot size:780ha from that owned land 180ha the condition is that per each hectare is to pay 700kg of cereals/year for the period of 10 years
Type of surface: arable
Soil quality:class I
Soil type: chernozem
907 - A14



907 Dolj province 368 hectares farm land
project A14
Dolj



Lot size: 183ha + 185ha
Type of surface: arable
Soil quality:Class I
Soil type: chernozem
908 - A18




908 Dolj province 500 hectares farm land
project A18


Dolj






Lot size: 500ha to 1200ha on lease. Current lease condition is 650kg/year/ha. The contract is for 10 years
Type of surface: plain
Soil quality: II
Soil type: chernozem, sandy loam
909 - A16





909 Dolj province 2200 hectares farm land
project A16


Dolj





Lot size: 2200ha from witch own propriety 800ha the condition is that per each hectare is to pay 650kg of cereals/year for the period of 10 years
Type of surface: arable
Soil quality: class I and II
Soil type: chenozem
910 - A17




910 Dolj province 500 hectares farm land
project A17

Dolj




Lot size: 500ha on lease. For taking the lease it is need it to be paid 800kg/ha/year and the contract is valid for 5 years
Type of surface: arable
Soil quality: II class
Soil type: reddish brown forest
911 - A19



911 Timis province 2200 hectares
agricultural soil project A19
Timis



Lot size: 2200ha (1000ha, 800ha 320ha)
Type of surface: all farmland
Soil quality: brown soil
Soil type: category I –II-III
912 - A20




912 Giurgiu province 500 hectares
farm land project A20

Giurgiu




Lot size: 500ha (100ha own property + 400ha lease, for this he pays 700kg/ha)
Type of surface: arable
Soil quality: chernozem
Soil type: category I – II
913 - A27



913 Timis province 40 hectares orchard
with fruit trees project A27

Timis



Lot size: 40ha
Type of surface: orchard with fruit trees and pasture
Soil quality:chernozem, podzolic clay illuviated
Soil type: 3-4 class
914 - A28



914  Arad province 600 hectares farm land
project A28
Arad



Lot size: 600ha
Type of surface: arable
Soil quality: chernozem
Soil type: category II – III
915 - A29





915 Dolj province 4000 hectares
agricultural soil project A29



Dolj





Lot size: 4000 ha of which 500ha owned and the remainder leased for a period of 10 years; the 2500 ha leased can be purchased from the owners
Type of surface: arable
Soil quality:calss I, II
Soil type: chernozem
916 - A30



916 Timis province 20 000 sm
agricultural soil project A30
Timis



Lot size: 20000 square feet
Type of surface: plain
Soil quality: II
Soil type: chernozem, sandy loam

917 - A31



917 Dolj province 1800 ha
agricultural soil project A31
Dolj



Lot size: 1800ha
Type of surface: plain  and hilly
Soil quality: II
Soil type: chernozem, sandy loam

918 - A32
918 Timis province 13 ha
agricultural soil A32
Timis



Lot size: 13 ha ( 3 Plots of land )
Type of surface: plain
Soil quality: II
Soil type: chernozem, sandy loam

919 - A37
919 Timis province 432 hectares
 agricultural soil project A37
Timis




Lot size: 432 ha of which 226 ha owned and 206 ha    leased and Farm
Type of surface: agricultural soil
Soil quality: chernozem
Soil type: Class 1
920 - A38




920 Timis province 623 hectares
agricultural soil project A38

Timis




Lot size: 623ha of witch 525ha owned
and 98ha leased
Type of surface: agriculture soil
Soil quality: cernoziom, black and brown soils
Soil type: Class 1, 80-90 point class
German standard
921 - A39



921 Timis province 424 hectares
agricultural soil project A39
Timis



Lot size: 424ha owned
Type of surface: agriculture soil
Soil quality: cernoziom, black and brown soils
Soil type: Class 1, 80-90 point class
German standard
922 - A40



922 Timis province 193 hectares
agricultural soil project A40
Timis



Lot size: 193 ha owned
Type of surface: agriculture soil
Soil quality: cernoziom, black and brown soils
Soil type: Class 1, 80-90 point class
German standard

Agricultural Land In Romania Landbouwgrond Roemenie Mail Frjacobs@Telenet.Be 


donderdag 29 maart 2012

Agriculture land romania 1000 hectare, 2000 hectare - 4600 hectare in Calarasi, 7427 hectare in Olt and 2959 hectare in Tulcea

Concessions with agricultural land for sale in Romania up to 49 years

Calarasi

625. some 4600 hectare compact 100%, cernozium class 1, irrigation - looking for a joint venture in the field of rebewable energy or any other proposition

Have a look: http://www.structural-funds-romania.ro/offer%20625/offer%20625.pdf

Olt

624. some 7427 hectare 100% consolidated - consession for 20 years
extendable for 10 eyars - compact 100%

Have a look: http://www.structural-funds-romania.ro/offer%20624/offer%20624.pdf

Tulcea

626. Some 2.959 hectare around 1700 Euro/hectare

Have a look: http://www.structural-funds-romania.ro/offer%20626/offer%20626.pdf

More info mail us cibr@telenet.be

zaterdag 11 juni 2011

Renewable Energy News Romania May 2011

Provided by Freddy M.E. Jacobs
Belgian Romanian Real Estate Chamber
President
www.cibr.be
www.investromania.be – the cibr blog
contact: frjacobs@telenet.be

Electromagnetica invests 10 million euros in two hydropower plants

Producer of electrical and telecommunications equipment Electromagnetica Bucharest (ELMA) has announced its intentions to invest some 10 million euros in the construction of a small hydropower plant and in the modernization of another unit of production in the Brodina River basin, located in the Suceava County (north-eastern Romania), Ziarul financiar daily reads on April 7. The plant is going to invest by 30% more than the amount provided for this purpose in the budget - 7.7 million euros, with the investment plan having already been approved by shareholders at the recent General Assembly. Electromagnetica started producing electric power in 2007, following the acquisition of several units from Hidroelectrica. The company recorded 6.7 million euros in net profit in 2009, double compared with results in 2008. The 2009 turnover amounted to about 94.6 million euros.

Source: Ziarul Financiar, 7 april 2011

Investors kick off works on 1,082 MW Romania-sited wind parks

The Construction works had kicked off by March 2011 for wind power projects with an aggregate installed capacity of 1,082 MW, director of the Renewable Energy Department of the National Energy Regulatory Agency (ANRE) Radu Regman told a seminar on energy. "Connection approvals were issued so far for a total capacity of 11,000 MW and contracts were signed for 6,000 MW; incorporation approvals were also issued and construction works have started for facilities with a combined capacity of 1,082 MW," said Regman. He added that "wind power will cover 70-80 pct of the renewable energy production target." Romania increased last year its installed wind capacity by 448 MW to 462 MW, landing the seventh position in the EU by the growth in volume, reads a report by the European Wind Energy Association - EWEA. The share of wind energy of the total domestic consumption is 24 pct in Denmark, 14 pct in Spain and Portugal, about 10 pct in Ireland and Germany, and 5.3 pct across the EU; wind power covers just 1.6 pct of Romania’s electricity consumption. Numerous wind power projects are underway or under preparation in Romania, developed by companies such as CEZ (350 MW), Iberdrola (500-600 MW), Verbund (200 MW), Energias de Portugal (230 MW) or Continental Wind Partners (232 MW).

Source: Agerpres, ROMANIAN ECONOMIC HIGHLIGHTS, April 11, 2011.

Energy industry in figures

Energy amount traded on PCCB in 2010, up to 79,165 GWh

The amount of energy traded last year on the Centralized Market of Bilateral Contracts (PCCB) was of 79,165 GWh, about 22 percent higher compared to the one traded in 2009, according to data centralized by the National Regulatory Authority for Energy (ANRE). The average trading price last year stood at 161.62 lei / MWh, compared to 161.37 lei / MWh in 2009. A volume of 28,942 GWh was traded based on regular contracts, and 50,223 GWh on negotiated contracts.

Thermal energy produced in 2010 amounts to 17,359 Tcal

The thermal energy generated in 2010 for delivery in Romania was 17,359 Tcal, 0.03 percent lower than in the previous year, according to data centralized by the Romanian Energy Regulatory Authority (ANRE). The thermal energy produced by cogeneration was 14,120 Tcal, 1.24 percent lower than in 2009. There was an amount of 2,522.73 Tcal of thermal energy produced for delivery in December 2010 and 2,161.68 Tcal of cogenerated energy.

Source: Agerpres, ROMANIAN ECONOMIC HIGHLIGHTS, March 21, 2011.


Local energy market to see robust growth by 2015

One of the most interesting phenomena to follow until 2015 on the energy market will be the trend of the wind segment, Ziarul Financiar daily writes. The reference year 2015 is indicated because the start of 2,500-3,000 MW capacity is estimated until then, namely the equivalent of four reactors of the Cernavoda nuclear power plant (southern Romania), which now has only two reactors in operation. To reach this level from wind energy production, investments of some 5 billion euros will be needed. According to European statistics, 448 MW were installed in Romania in wind farms last year, the equivalent of some investments worth 800 million euros. Numerous wind energy projects, developed by companies such as CEZ (350 MW), Iberdrola (500-600 MW), Verbund (200 MW), Energias de Portugal (230 MW) or Continental Wind Partners (232 MW), are under preparation or underway in Romania. Moreover, the projects done last year led to a capacity leap of over 32 times compared with 2009, Romania being the seventh EU member country in terms of newly finalized wind projects. Thus, local investments accounted for 5% of the total capacity newly installed in the 27 EU member states. The electricity consumption is also expected to rise by some 5-10% versus 2010, the quoted daily estimates. In terms of energy production generated from oil, although the price of barrel has exceeded the threshold of 100 dollars amid the incidents in North Africa, analysts believe its value could stand between 95 and 110 dollars per barrel in 2015, the quoted daily mentions. Also expected in 2015 are the first deliveries of natural gas through the transcontinental gas pipeline Nabucco, with 2011 being a milestone year for the achievement of this major European project. Moreover, the natural gas price is expected to be deregulated in 2015, which will bring substantial gains to producers but will also lead to higher bills for end-consumers, Ziarul Financiar estimates.

Source: Agerpres, ROMANIAN ECONOMIC HIGHLIGHTS, March 7, 2011.