For sale solar project 6 (5.99) MWp in Prahova county Romania FJ009

Type Two solar photovoltaic parks for green energyPark n° 1 : "FV1" Park n° 2 : "FV2" Planned commissioning, completion 2012 Location Romania, Prahova County Total Land Size approx. 14 haInstalled capacity approx. 5.99 MWp Installed capacity at kW installed approx. 5991 KWp Solar Modulus - free choice: single panel power: 230 Wp - Silicon Productivity 7000 MWh / year Calculated annual yield 7000 MWh / year Compensation for power supply 6 Green Certificates + Energy Price Calculated investment costs pro MW ca./approx. in € 2.000.000 € / MWLeases Price of the land: 2.500 €/year/ha Project Price: 200.000 €/MWp Nr. FJ009 More info: frjacobs@telenet.be

For sale solar project 2.6 MWp in Dolj county Romania FJ017

Size/Radiation Size (system capacity): 3.26 MW Output: 2.605 MW Annual Irradiation (PVGIS): 1440 KWh/M2 Authorization & Connection Status Project Type: Ground based Solar Plant PV System Type: Poly Cristal (can be changed) Stage: Partially Permitted Completion Date: N/A Connection Date: Within 2-3 Month Permissions still to be obtained: BP Taxes still to be paid: € 49.500 Components Modules: (To be specified by investor) Inverters: (To be specified by investor) Note:[Ex.: type and brand of inverters can be changed at additional costs (re-permitting taxes)] Land Plot Size: 5,6 hectare Status of use: Intravilan (with BP) User rights: Long Term Rent (option for Purchase) Yearly costs: 400 EURO/ha Distance to Grid Connection: 200 Mtrs. Tariff Total tariff (Q1-2012): +/- €390/MWh Type of tariff: FIT+GC GC term: Green Certificates 15 Yrs. FIT Payments: According to ANRE average (€52/MWh) Green Certificates: 6 Green Certificate Price: €57.35 (Q1-2012) Deal Structure Buyer obtains 100% of the shares in the SPV] Revenues (forecast) Annual Production: 3.428.000 KWh Annual Revenues: € 1.336.920 Annual Costs: € 156.000 Investment (Project Acquisition) Net Investment per MWp: € [207.293]*** Net investment Total: € [540.000] more info mail me frjacobs@telenet.be Nr. FJ017

For sale solar project 5.7 MWp in Teleorman county Romania FJ015

Following permits and authorizations have been issued: • Urbanism Certificate • Environmental Terms • Grid Connection Terms • All necessary authorizations and positive opinions from authorities and local councils,municipal and regional, are valid in place. • Building Permit • Power Purchasing Agreement is concerned, the work for obtaining this has commenced. Tracking systems with double axis The 5,7 MWp project will be constructed with double axis tracking systems. The PV Park will utilize 285 double axis tracking systems with 20 kWp installed capacity each, placed is such way to avoid shadowing and maximize energy yield. Tooling Electrical Equipment including medium and low voltage equipment will be delivered by the ABB concern whereas the cabling will be imported from the EU having all necessary certifications and other regulatory norms. All the equipment will be TUV certified, assuring the proper quality needed for obtaining the desired energy output. Output Using the PVGIS interactive on-line tool to access the solar radiation and photovoltaic potential of the area, the park output is estimated at 6,950,000 kw with a fixed system, and 9,590,000 with a double axis tracking systems. Nr. FJ015 Price on demand: frjacobs@telenet.be

For sale solar project romania Gorj province 20MW FJ010

A solar project of 20 MW in the province of Gorj near Tirgu Jiu on a surface of 52 hectares of land. The grid feed in is 23.063 Mwh and the specific annual yield is 1.153 kwh/kWp. contact frjacobs@telenet.be project nr . FJ010

For Sale solar project Romania 3 MW project in Arges County FJ011

Location: Arges County The plot is located at the Southern entrance passage through the Carpathian Mountains, Romania, 800 m from the asphalt to the European road E574 to Brasov (70 km) or Pitesti (60 km). Land Size: 9.2 hectares (1.8 hectares of land registered within the built-up area, the difference is registered as meadow) Land Type: naturally and partially forested, road access with 0.2% slop. Photovoltaic Installation: 3 MW Ownership: Company Distance to the Grid: 800 m from the 20 kV National network Remarks: Urbanism Certificate - in process; PUZ/Plan for Urban Zoning - in process; No Geo-technical Hazard; Meteorological Institute info: 2075 hours of Insolation and 4380 hours day light per year. Nr. FJ011 more info frjacobs@telenet.be

For sale solar project in Romania 56MWp in Satu Mare county FJ012

Solar project in Satu Mare county on 143 hectares with 56 MWp and 59.125 MWh. Nr. FJ012 More info : frjacobs@telenet.be

Solar projects in romania in Dolj County 80MW - several projects all between 4.8 and 10 MW FJ013

General Area Information Average GHR radiation in sites is in the range of 1400 KWh/m² and 1480 KWh/m² , among the best areas in Romania for solar PV . The area is suitable for solar PV developments (the first projects to obtain the connection permit in the corresponding substations). Projects will be delivered at fully permitted stage. For the PPA, Installation license and Grid Connection Agreement to be obtained, the final shareholder structure must be officially presented, and also the investment breakdown must be known. Capacity Large pipeline of 10 projects totaling near 80 MWp on more than 170 Hectares ; Concentrating in 4 different 20/110KV substations owned by CEZ Oltenia; Installed capacity ranging between 4,8 – 10 MWp; Connection in MV with an average distance to the substation of 250 meters /MWp; Land for the projects is owned by the SPVs. Nr. FJ013 More info frjacobs@telenet.be