Romanian Solar Summit 2013 – Feed-In Tariff, The Next Fuel For The Photovoltaic Industry

Under the slogan “Meet the PV Market!” the event organized under the auspices of RPIA – Romanian Photovoltaic Industry Association, by Govnet  Conferences, has brought together the most important players that are active in the solar market, also companies from complementary spheres and authorities alike.
The Summit has tested the current status of the Romanian photovoltaic market, the discussions reaching topics of great importance for all the factors involved in the development of these projects, from which can be mentioned also the information regarding the feed-in tariff dedicated to the photovoltaic plants that are under 1 MW, which is considered essential for development in this area.
After several postponing, the decision of the National Agency for Energy Regulation – ANRE regarding the introduction of the Feed-in tariff for installations bellow 1 MW as an alternative to the current supporting scheme that includes green certificates, could arise in short time.
The Feed-in tariff could be between 186-200 Euro/MW (according to an unofficial calculation), and starting with 2014, the new taxation of 1.5% will be applied to the photovoltaic projects also, as these are being considered special constructions.
Zsoltan Nagy, member of the ANRE board, has declared that after the previous discussions regarding the feed-in tariff, he hopes that the long-waited decision to be taken until the end of November 2013. It is possible that the value of this rate to overcome the cumulated value of three green certificates to which is being added the price of the energy. Thus, once the feed-in tariff is regulated, the beneficiaries could obtain for each Megawatt over 186 euros. Although, until the actual entry into force, several months will pass, Nagy estimating that the necessary approval, coming from the European Commission, could come only in March-April 2014.
Besides this good news, that it is expected will spur the development of the photovoltaic sector, especially in the area of rooftop solar installations, a less good news has come from the Ministry of Finance. According to Remus Vulpescu, Director of Cabinet of the Ministry of Finance, the new taxation of 1.5% for special construction will enter into force starting with 2014 and will affect photovoltaic plants also.
During the Summit, there have been brought into discussion the current challenges that the photovoltaic sector is facing, tax and legislative issues, solutions to the funding issue that most developers encounter, but also the opportunities that Romania has to offer.
Posted in 

donderdag 12 december 2013

Solar projects for sale romania

  

      20131002 Covasna county: 2.9 MW
The project is made for building a photovoltaic park, producing energy and connecting with the National Energy System.
Location: Covasna County
Land: superficies agreement
Type: ground base
Surface: 7.6 ha
Installed power: 2.9 Mw
Output power: 2900 kW
Stage: fully permitted, ready to construct

2    20131007 Arges county: 2.2 MW
The project is made for building a photovoltaic park, producing energy and connecting with the National Energy System.
Location: Arges County
Land: sales agreement
Type: ground base
Surface: 39.3 ha
Installed power: 2.2 Mw
Output power: 2000 kW
Stage: fully permitted, ready to construct

      20131008 Arges county: 0.99 MW
The project is made for building a photovoltaic park, producing energy and connecting with the National Energy System.
Location: Arges County
Land: superficies agreement
Type: ground base
Surface: 5.26 ha
Installed power: 0.99 Mw
Output power: 990 kW
Stage: fully permitted, ready to construct

      20131009 Arges county: 2.2 MW
The project is made for building a photovoltaic park, producing energy and connecting with the National Energy System.
Location: Arges County
Land: sales agreement
Type: ground base
Surface: 5.7 ha
Installed power: 2.2 Mw
Output power: 1980 kW
Stage: fully permitted, ready to construct

5    20131010 Arges county: 2.5 MW
The project is made for building a photovoltaic park, producing energy and connecting with the National Energy System.
Location: Arges County
Land: sales agreement
Type: ground base
Surface: 4.0 ha
Installed power: 2.5 Mw
Output power: 2300 kW
Stage: fully permitted, ready to construct

      20131125 Arges county: 2.75 MW
The project is made for building a photovoltaic park, producing energy and connecting with the National Energy System.
Location: Arges County
Land: sales agreement
Type: ground base
Surface: 5.5 ha
Installed power: 2.75 Mw
Output power: 2470 kW
Stage: fully permitted, ready to construct

More info frjacobs@telenet.be

vrijdag 8 november 2013

Solar And Renewable Energy Projects

We have the belief that energy will be a considerable cost factor in the near future. Companies should start to work on an energy plan as the cost of energy will rise in the coming years. 
Investors in re-energy on the other hand should act now and prepare for the shift to green energy and autonomous energy production.
We offer a variety of services in the re-energy domain:
Sales of ready to build and turn key projects
We perform quick scans and offer a wide range of ready to build and turn key projects to potential investors. We work directly with the owners of the project. The data can be accessed after that we have made an “nda” and “commission contract”  with the potential investor. We offer access to data rooms for each specific project.
Audit of projects and due diligence
With our experienced project managers and lawyers we will do an audit after discussion of the framework of  the audit on ready to build or turn key projects (asset deals).The technical due diligence for renewable energy projects will help you to understand the technical feasibility of your project. You will understand a variety of technical, legal and socio-environmental risks before you commit your valuable time and resources to the project. We will identify technical risks that could compromise your project’s profitability. We will check if all factors have been accounted for in the development process.
Project management
·  Coordinate the process of land acquisition, grid connection, licenses, green certificates and
   permitting (specialized consultancy companies).
·  Produce detailed project schedule and identify critical milestones in conjunction with the project.
·  Coordinate with the appropriate resources to meet project budget and schedule.
·  Contract and manage outside vendor relationships.
·  Responsible for completing the project on time, on budget, and to a high level of quality.
·  Administer the terms of the contract, approve terms of purchase orders placed and prepare
   applications for payment.
·  Serve as principle interface with the customer and on-site vendors/sub-contractors.
·  Execute essential paperwork and on-line documentation as needed to ensure accounting has what is
    required for payroll, accounts payable and billing.
·  Review construction and commissioning plans with customer to ensure alignment of expectations and
    identify points at which contractual obligations will have been met.
·   Deliver as-built documentation and ensure that final customer payment is received.
·   Supervise the technical control, grid connection and Start-up of the installation

Renewable Energy Report Romania Edition October 2013

Nr. 02/2013 October



1.      Opportunities and projects renewable energy Romania
2.      Market intelligence: news on wind energy solar energy in Romania and other renewable energy projects in Romania
3.      Incubation activities of the chamber for your energy projects
4.      Projects management activities for your energy projects

The full report is in anexa 25 pages of market news.

1.    Opportunities and projects renewable energy Romania
1.1 Turn key projects:
We have 3 turn key solar plants for sale in Romania in Constanta county.
1 PV plant of 4.5 MW*
1 PV plant of 3.0 MW*
1 PV plant of 4.8 MW*
*installed DC
We are looking for funds or other investors to buy them ( Alt - Energy funds, Energy Funds, Pension Funds, etc...private investors with own equity). They are compliant with the EU and Romanian regulations in place. The solar plants are delivered by an asset deal (sharedeal) in Q4 of 2013 depending on the project execution (ongoing). The are located beside the Romanian Caost line at  he Black Sea. We ask that only serious investors react. We only deal directly with the investors.
1.2  Ready to build projects:
Arges County: 2.7 MW
The project is made for building a photovoltaic park, producing energy and connecting with the National Energy System.
Location: Arges County
Land: easement contract
Type: ground base
Surface: 5.2 ha
Installed power: 2.7 Mw
Output power: 2500 kW
Stage: fully permitted, ready to construct

Arges county: 0.89 MW
The project is made for building a photovoltaic park, producing energy and connecting with the National Energy System.
Location: Arges County
Land: easement contract
Type: ground base
Surface: 14 ha
Installed power: 0.89 Mw
Output power: 800 kW
Stage: fully permitted, ready to construct

Dolj county: 3MW
The project is made for building a photovoltaic park, producing energy and connecting with the National Energy System.
Location: Dolj County
Land: superficie contract
Type: ground base
Surface: 6.5 ha
Installed power: 3 Mw
Output power: 2900 kW
Stage: fully permitted, ready to construct

Gorj county: 2.7 MW
The project is made for building a photovoltaic park, producing energy and connecting with the National Energy System.
Location: Gorj County
Land: superficies contract
Type: ground base
Surface: 47.8 ha
Installed power: 2.7 Mw
Output power: 2500 kW
Stage: fully permitted, ready to construct

Covasna county: 2.9 MW
The project is made for building a photovoltaic park, producing energy and connecting with the National Energy System.
Location: Covasna County
Land: superficies agreement
Type: ground base
Surface: 7.6 ha
Installed power: 2.9 Mw
Output power: 3200 kW
Stage: fully permitted, ready to construct

full report at

http://www.investromania.be/re-energy/renewable-energy-report-romania-edition-october-2013

zondag 15 september 2013

Turn Key Solar Projects In Romania For Sale - Solar Projects Romania

We have 3 turn key solar plants for sale in Romania. 1 PV plant of 4.5 MW* 1 PV plant of 3.0 MW* 1 PV plant of 4.8 MW* *installed DC We are looking for funds or other investors to buy them ( Alt - Energy funds, Energy Funds, Pension Funds, etc...private investors with own equity). They are compliant with the EU and Romanian regulations in place. The solar plants are delivered by an asset deal (sharedeal) in Q4 of 2013 depending on the project execution (ongoing). The are located beside the Romanian Caost line at he Black Sea. We ask that only serious investors react. We only deal directly with the investors. For more details: frjacobs@telenet.be

vrijdag 28 september 2012

For sale solar project 6 (5.99) MWp in Prahova county Romania FJ009

Type Two solar photovoltaic parks for green energyPark n° 1 : "FV1" Park n° 2 : "FV2" Planned commissioning, completion 2012 Location Romania, Prahova County Total Land Size approx. 14 haInstalled capacity approx. 5.99 MWp Installed capacity at kW installed approx. 5991 KWp Solar Modulus - free choice: single panel power: 230 Wp - Silicon Productivity 7000 MWh / year Calculated annual yield 7000 MWh / year Compensation for power supply 6 Green Certificates + Energy Price Calculated investment costs pro MW ca./approx. in € 2.000.000 € / MWLeases Price of the land: 2.500 €/year/ha Project Price: 200.000 €/MWp Nr. FJ009 More info: frjacobs@telenet.be

For sale solar project 2.6 MWp in Dolj county Romania FJ017

Size/Radiation Size (system capacity): 3.26 MW Output: 2.605 MW Annual Irradiation (PVGIS): 1440 KWh/M2 Authorization & Connection Status Project Type: Ground based Solar Plant PV System Type: Poly Cristal (can be changed) Stage: Partially Permitted Completion Date: N/A Connection Date: Within 2-3 Month Permissions still to be obtained: BP Taxes still to be paid: € 49.500 Components Modules: (To be specified by investor) Inverters: (To be specified by investor) Note:[Ex.: type and brand of inverters can be changed at additional costs (re-permitting taxes)] Land Plot Size: 5,6 hectare Status of use: Intravilan (with BP) User rights: Long Term Rent (option for Purchase) Yearly costs: 400 EURO/ha Distance to Grid Connection: 200 Mtrs. Tariff Total tariff (Q1-2012): +/- €390/MWh Type of tariff: FIT+GC GC term: Green Certificates 15 Yrs. FIT Payments: According to ANRE average (€52/MWh) Green Certificates: 6 Green Certificate Price: €57.35 (Q1-2012) Deal Structure Buyer obtains 100% of the shares in the SPV] Revenues (forecast) Annual Production: 3.428.000 KWh Annual Revenues: € 1.336.920 Annual Costs: € 156.000 Investment (Project Acquisition) Net Investment per MWp: € [207.293]*** Net investment Total: € [540.000] more info mail me frjacobs@telenet.be Nr. FJ017

For sale solar project 5.7 MWp in Teleorman county Romania FJ015

Following permits and authorizations have been issued: • Urbanism Certificate • Environmental Terms • Grid Connection Terms • All necessary authorizations and positive opinions from authorities and local councils,municipal and regional, are valid in place. • Building Permit • Power Purchasing Agreement is concerned, the work for obtaining this has commenced. Tracking systems with double axis The 5,7 MWp project will be constructed with double axis tracking systems. The PV Park will utilize 285 double axis tracking systems with 20 kWp installed capacity each, placed is such way to avoid shadowing and maximize energy yield. Tooling Electrical Equipment including medium and low voltage equipment will be delivered by the ABB concern whereas the cabling will be imported from the EU having all necessary certifications and other regulatory norms. All the equipment will be TUV certified, assuring the proper quality needed for obtaining the desired energy output. Output Using the PVGIS interactive on-line tool to access the solar radiation and photovoltaic potential of the area, the park output is estimated at 6,950,000 kw with a fixed system, and 9,590,000 with a double axis tracking systems. Nr. FJ015 Price on demand: frjacobs@telenet.be

For sale solar project romania Gorj province 20MW FJ010

A solar project of 20 MW in the province of Gorj near Tirgu Jiu on a surface of 52 hectares of land. The grid feed in is 23.063 Mwh and the specific annual yield is 1.153 kwh/kWp. contact frjacobs@telenet.be project nr . FJ010

For Sale solar project Romania 3 MW project in Arges County FJ011

Location: Arges County The plot is located at the Southern entrance passage through the Carpathian Mountains, Romania, 800 m from the asphalt to the European road E574 to Brasov (70 km) or Pitesti (60 km). Land Size: 9.2 hectares (1.8 hectares of land registered within the built-up area, the difference is registered as meadow) Land Type: naturally and partially forested, road access with 0.2% slop. Photovoltaic Installation: 3 MW Ownership: Company Distance to the Grid: 800 m from the 20 kV National network Remarks: Urbanism Certificate - in process; PUZ/Plan for Urban Zoning - in process; No Geo-technical Hazard; Meteorological Institute info: 2075 hours of Insolation and 4380 hours day light per year. Nr. FJ011 more info frjacobs@telenet.be

For sale solar project in Romania 56MWp in Satu Mare county FJ012

Solar project in Satu Mare county on 143 hectares with 56 MWp and 59.125 MWh. Nr. FJ012 More info : frjacobs@telenet.be

Solar projects in romania in Dolj County 80MW - several projects all between 4.8 and 10 MW FJ013

General Area Information Average GHR radiation in sites is in the range of 1400 KWh/m² and 1480 KWh/m² , among the best areas in Romania for solar PV . The area is suitable for solar PV developments (the first projects to obtain the connection permit in the corresponding substations). Projects will be delivered at fully permitted stage. For the PPA, Installation license and Grid Connection Agreement to be obtained, the final shareholder structure must be officially presented, and also the investment breakdown must be known. Capacity Large pipeline of 10 projects totaling near 80 MWp on more than 170 Hectares ; Concentrating in 4 different 20/110KV substations owned by CEZ Oltenia; Installed capacity ranging between 4,8 – 10 MWp; Connection in MV with an average distance to the substation of 250 meters /MWp; Land for the projects is owned by the SPVs. Nr. FJ013 More info frjacobs@telenet.be